Maps & Interactive Image

    CONTACTSchedule A Visit
    Or Give Us A Call

    The arrangement and layout of the apartments maximises natural light, opening to elegant private balconies, which provide residents with outdoor living areas to enjoy fresh air fruit to identify a ballpark value added activity to beta test.

    Everything Within Reach

    Everything Within Reach

    http://www.costruzionieimmobiliare.it/wp/wp-content/uploads/2020/01/interactive_image_01-1280x733.jpg
    01
    Floors
    Windows, skylights, vents, and glass portions of doors helps to control solar heat loss and gains.
    02
    Windows
    An energy recovery ven­ti­la­tion system provides con­trolled ven­ti­la­tion and minimizes energy loss change management inside.
    03
    Walls
    An energy recovery ven­ti­la­tion system provides con­trolled ven­ti­la­tion and minimizes energy loss change management inside.
    04
    Kitchen Faucet
    An energy recovery ven­ti­la­tion system provides con­trolled ven­ti­la­tion and minimizes energy loss change management inside.
    05
    Kitchen Appliances
    An energy recovery ven­ti­la­tion system provides con­trolled ven­ti­la­tion and minimizes energy loss change management inside.
    http://www.costruzionieimmobiliare.it/wp/wp-content/uploads/2022/09/Logo-costruzioni-e-immobiliare-cei-group-milano.png

    COSTRUZIONI & IMMOBILIARE S.R.L.

    P. IVA e C.F.: 06863130966
    info@ceigroupmilano.it

    Follow us:

    INSTAGRAM
    CONTATTACI
    0257302096
    0256807078

    C&I Group Milano

    Orari segreteria:

    dal lunedì al venerdì

    dalle ore 9:00 alle ore 13:00

    dalle ore 14:00 alle ore 18:00

    © C&I Group Milano 2022. All rights reserved.

    Realizzato da Cromatina®